An asbestos survey for property developers is easiest to manage when it’s treated as a standard line item in the project programme, rather than an unplanned step that surfaces once acquisition has already been completed. Here’s how to build it into your process from the outset.
Got a development that needs surveying? Call 07703 203930 or 07711 855891, or get a free quote below.
Get A Free QuoteBefore You Exchange: Due Diligence Surveys
For sites being acquired for conversion or redevelopment, a pre-purchase survey can materially change your numbers – the presence and extent of asbestos-containing materials affects removal costs, programme length, and in some cases the viability of the scheme itself. Commissioning this ahead of exchange, rather than after, means it feeds into your offer rather than becoming a post-completion surprise.
Planning an Asbestos Survey for Property Developers: Building It Into Your Programme
Once a scheme is confirmed, a refurbishment and demolition survey covering the full extent of planned works is a legal requirement before any intrusive work begins, in line with HSE’s regulations on managing asbestos in buildings. For developers running multiple sites, it’s worth standardising this as a fixed step early in the programme – survey confirmed and booked at the same point planning applications go in, rather than left until contractors are ready to mobilise.
Phased developments and multi-unit sites
Larger sites being developed in phases benefit from a survey strategy that mirrors the build programme – front-loading survey work on the units due for construction first, rather than treating the whole site as one undifferentiated block. This keeps early phases moving without waiting for a site-wide survey to complete.
Managing a multi-phase or multi-site development? We can structure the survey programme to match your build sequence.
Get A Free QuoteWorking With Your Existing Consultant Team
We regularly work alongside architects, project managers, and principal designers, providing survey findings in a format that slots directly into pre-construction information and CDM documentation. Getting this coordination right early avoids duplicated effort later, particularly on schemes where the survey findings directly affect demolition sequencing or structural design decisions.
Areas we cover
We carry out an asbestos survey for property developers across the North of England, from single-site conversions through to multi-phase commercial and residential schemes.
Frequently Asked Questions
Should an asbestos survey happen before or after exchange?
Before, wherever possible. A pre-purchase survey gives you accurate figures to inform your offer, rather than discovering the cost and programme impact after you’ve already committed.
Can survey findings feed into CDM pre-construction information?
Yes – we can provide reports in a format that integrates directly with your principal designer’s documentation, which is standard practice on most of our commercial projects.
Do you offer preferential terms for developers with multiple sites?
Get in touch with details of your sites and we’ll discuss a survey programme and pricing structure that works across multiple properties.
Talk to us about your development. Call 07703 203930 or 07711 855891.
Get A Free Quote